Open the service · Getting started
Google Ads Data Manager connects advertising measurement to your outcome data. Start with one confirmed event after an enquiry, prepare fields without sending and test an approved import before scheduling it.
How to prepare
Data Manager connects sources to selected Google products and functions. The overview covers audiences and conversion imports. This guide covers the latter: an ad enquiry whose outcome becomes known later.
For example, count qualified enquiries or completed purchases. Define the event in your records first: when it occurs and its evidence. Do not call every form submission a sale. Tag Assistant tests tags; transferring recorded outcomes is a different task.
- Find the existing ad account, conversion action and active imports.
- Choose one outcome and source. Confirm data ownership and permission to send to Google.
- Prepare a field map using a de-identified example without uploading it as a real conversion.
Source connections may require administrator rights and acceptance of customer-data terms. Check the available role first. Show the owner specific steps for new rights or terms rather than silently expanding access.
How to choose a source and transfer method
Open Tools → Data manager in the existing account. Check supported sources and connection purpose. Audience-data connections do not replace conversion-import setup.
For a first trial, use an available supported source and the interface. For a custom server process, study the separate Data Manager API, rather than mechanically copying an old Google Ads command.
Google describes migration of relevant uploads from Google Ads API to Data Manager API. Check existing method, availability and migration plan before changing an integration. Keep the working import until its replacement is tested, without parallel duplicate sending.
Compare direct connections with an existing connector. Check fields, delays, costs and stopping before buying another service.
How to check fields and transmission permission
Follow data preparation rules for the chosen import schema. Verify action name or purpose, event time, time zone, applicable amount and currency, matching identifier and duplicate-event recognition.
Time must represent the outcome, such as a completed purchase, rather than export time. Use unambiguous dates instead of 02/01/2026. If the time zone is absent, check the intended transformation setting rather than assume the computer's zone.
Contacts may require normalisation and hashing. Check whether the selected connection performs them, and do not hash already hashed values again. Hashing does not replace permission or make contacts unrestricted for use.
Before real connection, show the owner fields, source, Google recipient, purpose, volume and schedule. A de-identified schema is enough for preparation. Report-reading permission does not authorise sending a customer database.
How to test import and repetition
After the owner's decision, follow the connection guide. Check source-to-destination mapping, filters and transformations. Recheck selected rows and schedule before saving, which may start processing.
Verify in order:
- The source event exists and meets the outcome definition.
- The import selects the correct action and rows.
- Processing history has no unexplained errors, omissions or extra rows.
- After the expected delay, inspect the report event and its match to advertising.
Acceptance does not prove an advertising-interaction match. Do not invent contacts, click identifiers or sales to fill missing results. Investigate the actual error, mapping and event-accounting conditions.
Before regular imports, check the method's duplicate rules. Preserve source-event identity on retries rather than create a new ID to bypass errors. Prepare repetition tests on a separate data copy first; real repeated uploads need agreed limits.
Result
You get a field map and checked connection for one outcome, or completed preparation when sending is not yet authorised. Distinguish the source event, ingestion result and report appearance.
Before scheduling, verify the source updates in time. Follow connection management to save and verify the stop method. Stopping future runs does not delete previous data. Agree on source changes and disconnection with the owner first.
Next: check and improve Google Ads campaigns. Linking outcomes helps analysis; assess returns from actual costs and outcome value.
Prompt for preparing and checking an import
Paste into Codex or Work with project materials:
Find our Google Ads account, conversion action, imports and confirmed recorded outcomes. Choose one outcome and supported Google Ads Data Manager source. Check the current connection method and whether Data Manager API replaces the old method; preserve the working integration until its replacement is tested.
Without sending, prepare a de-identified field map: event, time and time zone, applicable amount and currency, matching and duplicate protection. Check the method's filters, normalisation and hashing. Do not upload the example as a real sale.
Before transmission, explain data, source, Google recipient, purpose, volume, schedule and new permissions. Request missing owner decisions. Perform authorised actions yourself; give one specific step for terms acceptance or sign-in.
After an approved trial, verify source event, acceptance, errors, omissions and delayed report. Distinguish acceptance from matching and advertising accounting. Check safe retries, source readiness for scheduling and stopping the process. Save actual results without customer data or secrets. Do not enable regular transfer or change all campaigns' goals without the corresponding decision.